Product Details
+
- Code: WBS0011
- Drinkware Category: Water Bottle
- Drinkware Type: Stainless Steel Bottle
- Material: 304 Stainless steel.
- Capacity: 700ml
- Accessories: Vacuum
- Color: Black, White, Grey, Red, Green, Blue, Orange
- Design Style:
- Water Flowing Method: Direct Drinking
- Thermal Insulation Performance: 12-24 hours
- Anti-corrosion Coating: Applicable
- Boiling Water: Applicable
- Suitable for: All
- Outdoor Activity: School, Travel, Picnic, Office
- Occasion: Back to School, Business Gift
- Notes: 1. Please allow 1-3mm differences due to manual measurement, thank you! 2. Due to the difference between different monitors, please understand that the picture may not reflect the actual color of the item.